Shanghai Fengpu Industrial Park, Your Successful Business Home in Shanghai, China

Shanghai Fengpu Industrial Park
Export Processing Zone

 Brief introduction Advantages Location Environment Zone layout Transportation Infrastructure
 Utility charge Human Resource Preferential Policies Standard Workshop
  Home>about export processing zone>Infrastructure
 Water Supply
   There are two water supply stations with the capacity of daily supply of 300,000 tons( water is mainly supplied by the Shanghai Shaohe Waterworks, a Sino-French joint venture, and the water quality reaches the national standard) .
 
 Power Supply
   There are three 35KV electric substations in the park, capable of supplying 120 million watts per day. Furthermore, located right alongside the park is Asia's largest 500KV alternate-direct current electric conversion station.
 Natural Gas Supply
   The industrial park has already used a more effective natural gas, which is channeled in from the western provinces of China with the capacity of 300,000m3 per day. The "west gas" mainly refers to the natural gas resources discovered in the Xinjiang Tarim Basin. "the transportation of the natural gas from the west to the east" project constructed about 4,200 kilometers pipeline, which transport the natural gas from Tarim Basin to Shanghai, Zhejiang through Gansu, Ningxia, Shaanxi, Shanxi, Henan, Anhui, Jiangsu, supplying the civil and the industrial use for provinces along the line.
 
 Telecommunication
   There is an independent Electronic Telephone Exchange,with the capacity of 100,000 program-controlled telephones and is able to provide ISDN, IDD, DDD, ASDL, FTTB and other advanced telecommunications services.
 Sewage Drainage
   Beside the park there's a sewage-discharge project with a daily treatment capacity of 100,000 tons.
 Rain water drainage
   Adopts the "concealed piping and natural flow method", with pipe diameters ranging from 450 to 2000 mm, amounting to drainage capacities of 3 cubic meters per second (according to historical records, the largest downpour over the past 100 years would take less than 15 minutes to drain through these pipes).
 road
  are 36km high rank main road with 6 ways in fengpu industrial park.
 flood
  The land within the park is level, high, and of superior quality. The terrain is 4.2-4.8 meters higher than Wusong's "0" degree, so there's no menace of flood.
<< Transportation Utility Charge >>
Copyright © 2005 Fengpu Ltd.All Right Reserved. Contact Us | Sitemap | Disclaimer | Copyright | Home
 About EPZ
 Investment Guide
 Quality Life
 Standard Service
 Existing Corporation
 First Page
 Site Map
 Policy
 Contact Us