| project |
yes/no |
introduction |
Detail data |
| electricity |
yes |
One power station(10,000V) within factory area |
Customer need apply from power department according to its usage |
| water |
yes |
Municipal water supply |
One line for fire control with dia. 200, One line for workshop with dia.200( this line has be prepared, customer only need to apply to open it from water department) |
| drainage |
yes |
Municipal drainage |
This system has been connected with municipal drainage system |
| Natural gas |
yes |
|
The pipes has been prepared, customer need apply it by themself |
| sewage |
yes |
Municipal system |
The system has been connected with municipal system |
| elevator |
yes |
2 ton max |
Size:2.5m*1.7m*2.3m, height=2.3m Speed: 0.5m/s |
| MAX weight |
first level with 0.5 ton Ground level with 3 ton |
| Acreage |
850m2—7700m2 |
| Charge of management |
1.5 RMB/MONTH/M2 |
| Project of management |
- security : the security goes the round within workshop area
- cleaning : all the road, ground and greens will be cleaned and maintained regularly
- regularly maintaining of workshop: water problem with roof and wall
- 4all the pipes like water pipes and sewage pipes will be maintained regularly
|